What is a Network Diagram in Project Management? An Overview


Managing multiple tasks without a clear flow is like solving a puzzle without all the pieces. You may be busy, but progress feels slow and confusing, with delays appearing when you least expect them. This is where a Network Diagram becomes the utmost necessity for every project.

It clearly shows how tasks are connected and in what order they should be completed. In this blog, you will learn what a Network Diagram in Project Management is, how it plans schedules, manages dependencies, and keeps projects on track from start to finish. Let's get started and plan projects more effectively!
 

What is a Network Diagram in Project Management?


A Network Diagram in Project Management is a visual representation of a project’s activities and their logical sequence. It shows the order in which tasks need to be performed, along with dependencies that determine how one activity affects another.

Each activity in the diagram is connected using arrows or nodes to show relationships such as which tasks must finish before others can start. This allows Project Managers to see the progress of the project flow.
 

What is a Project Network?


A project network refers to the complete sequence of tasks required to complete a project. The tasks are arranged in logical order based on dependencies and project workflow. It shows the workflow of tasks required to complete a project and helps in planning, scheduling, and identifying the critical path.
 


 

Types of Project Network Diagrams


There are several types of project Network Diagrams used in Project Management. Each type offers a slightly different way of representing activities and dependencies. Let's now check those types:
 

1) Activity-on-Node (AON) Diagrams


Activity-on-Node (AON) diagrams, also known as the Precedence Diagramming Method (PDM), are the most widely used type of Network Diagram in modern Project Management. In this, each activity is represented by a node, usually shown as a box or rectangle. Each node includes details such as task name, duration, start time, and finish time.
 


 

Here, there will be arrows between the boxes to show which task comes next. This makes the diagram easy to read and understand. This type is ideal for finding the critical path of a project and supports all dependency types such as

1) Finish-to-Start (FS): One task must be finished before the next can start.

2) Start-to-Start (SS): Two tasks must start at the same time or one can start only after the other starts.

3) Finish-to-Finish (FF): One task must be finished only when another finishes.

4) Start-to-Finish (SF): A task cannot be finished until another task starts (rare).
 

2) Activity-on-Arrow (AOA) Diagrams


In Activity-on-Arrow (AOA) diagrams, also known as the Arrow Diagramming Method, all tasks are shown using arrows rather than boxes. The points where arrows meet show the start or end of tasks. AOA diagrams were more commonly used in earlier Project Management practices, and now they are less commonly used.
 


 

This is because they often require extra arrows called dummy activities to show logical flow. This made the diagram harder to understand and is used less often today, and it primarily supports only Finish-to-Start (FS) dependencies.

Apply advanced control techniques through PRINCE2® Foundation & Practitioner Training – Register today!
 

How to Make a Project Network Diagram?


Creating a project Network Diagram is a structured process. The following steps explain how to create an effective diagram that supports better planning and control:
 


 

1) List all Activities


The first step is to identify every task required to complete the project. A complete task list ensures no important work is missed during planning.

1) Use the Work Breakdown Structure (WBS) as your starting point

2) Break tasks into clear, manageable activities

3) Avoid combining multiple actions into one task

4) Ensure each activity has a clear outcome

5) Review the list with your team for accuracy
 

2) Determine Dependencies


Dependencies define the order in which tasks or activities have to be completed. They help you understand the tasks that depend on others to start or finish.

1) Identify tasks that have to be finished before another task can start

2) Find tasks that can be worked on at the same time

3) Use finish-to-start as the default relationship

4) Write down any assumptions made about task order

5) Check task dependencies with experienced team members
 

3) Establish Duration Estimates


This step is about checking how long each activity will take to complete. Accurate estimates are important for building a project schedule that feels realistic.

1) Use historical data from previous projects

2) Ask experienced team members for time estimates

3) Check if enough people and resources are available

4) Add some extra time to handle unexpected issues

5) Don’t assume that tasks will finish sooner than the required time
 

4) Draw the Network


Here, activities are arranged in sequence and connected based on their dependencies. The goal is to create a clear visual flow from the project start to finish.

1) Start with the first activity and work forward

2) Use common symbols so the diagram is easy to understand

3) Keep the diagram simple and easy to follow

4) Try not to cross arrows to avoid confusion

5) Use Project Management software for large projects
 

5) Calculate Critical Path


The final step is identifying the critical path. This path identifies the longest sequence of dependent activities. Any delay in these tasks will directly affect the project completion date.

1) Calculate when each task can start and finish at the beginning

2) Find tasks that have no extra time available

3) Closely monitor tasks that affect the project end date

4) Update the critical path when the schedule changes

5) Use the critical path to prioritise resources

Learn how to balance flexibility and control in project delivery with PRINCE2 Agile® Foundation and Practitioner Training – Join anytime!
 

Benefits of a Project Network Diagram


A Network Diagram in Project Management offers numerous benefits that improve planning, execution, and communication across teams and stakeholders. The following are its benefits:
 


 

1) Effective Time Management


1) Reduces delays by showing a clear task order

2) Saves time by avoiding waiting between tasks

3) Improves planning from the beginning

4) Helps teams work more efficiently

5) Reduces sudden schedule changes
 

2) Control Over the Task Sequence


1) Clearly shows which task should be done first

2) Prevents tasks from starting too early or too late

3) Maintains a logical flow of work

4) Reduces confusion among team members

5) Improves overall project coordination
 

3) Visual Representation of Progress for Stakeholders


1) Makes project plans easy to understand

2) Helps explain progress without technical details

3) Improves transparency and communication

4) Supports better decision-making

5) Builds stakeholder trust and confidence
 

4) Establishing Project Workflows


1) Defines clear work sequences and handovers

2) Improves collaboration between teams

3) Reduces confusion or repetition of project tasks

4) Supports smoother task transitions

5) Supports consistent work processes
 

5) Tracking Dependencies and Potential Bottlenecks


1) Highlights task dependencies clearly

2) Helps identify possible delay areas in your project

3) Helps manage risks before they become bigger issues

4) Makes it easier to adjust schedules

5) Reduces the impact of unexpected issues

Strengthen your practical Project Management skills with PRINCE2® Practitioner Training – Sign up soon!
 

Challenges of Project Network Diagram 


Despite the benefits, the Network Diagram in Project Management also presents certain challenges. Those include:
 

1) Time-consuming


1) Takes a lot of time to create a Network Diagram

2) Needs detailed planning before execution

3) Involves multiple discussions with team members

4) Slows down planning at the early stages

5) Takes longer when projects are large
 

2) Complexity


1) Can be difficult for beginners to understand

2) Looks confusing in large and complex projects

3) Hard for non-technical stakeholders to follow

4) Requires careful explanation and guidance

5) Needs some experience to read correctly
 

3) Maintenance


1) Needs regular updates throughout the project

2) Becomes outdated if not updated frequently

3) Changes affect the entire project schedule

4) Requires continuous monitoring and revision

5) Needs dedicated effort to maintain
 

4) Learning Curve


1) Takes time for users to learn and understand

2) Difficult for new Project Managers when they do it initially

3) Requires basic Project Management knowledge

4) Needs practice to use effectively

5) Slows adoption for inexperienced teams
 

5) Limited Flexibility


1) Difficult to change once the diagram is final

2) Not suitable for frequent project changes

3) Requires updates whenever plans change

4) Less flexible in fast-moving projects

5) Can feel restrictive during execution
 

Conclusion


A Network Diagram in Project Management is far more than a planning document. It is a strategic tool that brings structure, clarity, and control to your projects. By visualising activities and dependencies, it allows Project Managers to predict challenges, manage time, and communicate plans clearly. For projects where time, coordination, and accuracy matter, a well-constructed Network Diagram becomes essential.

Improve your ability to manage timelines and project outcomes with PRINCE2® Certification – Begin your journey now!

cross

Get in Touch With Us

red-star Who Will Be Funding the Course?

red-star
red-star
+44
red-star

Preferred Contact Method

cross
discount

40%

SPECIAL BIG DEALS

Level Up Your Skills – Enroll Now!

Unlock up to 40% off today!

red-star Who Will Be Funding the Course?

red-star
red-star
+44
red-star